System Safety Engineering (CSM RA Compliance)

High Speed Rail Solutions' system safety engineering services are conducted in accordance with the requirements of the Common Safety Method for Risk Evaluation and Assessment (CSM RA) Regulations and CENELEC standards EN50126, EN50128 and EN50129.

 

We are providing these specialist services to a variety of clients to demonstrate that their systems and projects are being safely integrated into the existing railway network.

 

We know what it takes to ensure that projects receive supportive Safety Assessment Reports from independent Assessment Bodies and Independent Safety Assessors; subsequently leading to signed Declarations of Control of Risk, endorsement from System Review Panels and Authorisation for Placing into Service from National Safety Authorities (e.g. the ORR in the UK).

We have helped our clients with:

  • Project Authorisation Strategy development
  • System Definition development
  • System Context Diagram development
  • CSM RA Significance assessments, including stage work assessments
  • Planning of System Safety activities
  • Hazard Record development and management
  • Hazard Identification (HAZID) workshops
  • Risk Assessment workshops
  • Safety Requirement development
  • Compliance Justification statements
  • Technical and Process Failure Modes Effects and Criticality Analysis (FMECA)
  • Hazard Transfer management
  • Generic and Specific Application Safety Case (GASC / SASC) development
  • Safety Justification Report (SJR) development
  • Liaison with Assurance and System Review Panels
  • Liaison with internal and external Independent Safety Assessors (ISAs) and CSM RA Assessment Bodies (AsBos)

Project Examples

Brent Cross New Station

High Speed Rail Solutions, along with our professional services partner are leading the system safety engineering activities for a Local Authority in North London who are developing a new Railway Station at Brent Cross.

ETCS

We are working with a leading equipment supplier who are deploying a new safety critical signalling product into the UK. Our works have included the generation of a number of safety reports to allow for installation activities as well as Safety Cases in accordance with EN 50129.

For more information

Follow us on Social Media

Print Print | Sitemap
© 2021. High Speed Rail Solutions Limited